Newly laid railway track take some time to stabilise, thats why first goods train are operated for a period and then passenger trains are operated at reduced speed. Afterwards speed is gradually increased depending on the condition of track. But 1 year period appears to be pretty long period. Probably be Indore - Mhow section was commissioned in a hurry to match the Recent Kumbh at Ujjain.