News Entry#
0 JCO 13.10.2019 cancelled Due To Infrastructure work on southeast ghat for 10 days.
New CC from 3.11.19 to 1.12.191 AC First cum Second Tier, 1 AC 2Tier, 1 AC 3Tier, 10 Sleeper Coaches, 8 general coaches.
News Entry# 392909
JCO 13.10.2019 cancelled Due To Infrastructure work on southeast ghat for 10 days.