In one of the letters he himself talks about terminal congestion in Mysuru , but ironically requests for 3 train extensions to Mysuru.
But to be fair to him, at least his letter (whoever has drafted it) mentions platform turnaround time, Primary maintenance etc which is unlike many other letters sent by MP's who merely write about new trains and extensions without even checking if it is possible. Instead of KCVL-SBC at least they could try for ERS-BAND (bi weekly) and KCVL-BAND (Humsafar) which have a much longer layover period at BAND. Earlier when it was proposed, it was rejected by SWR.