Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Jun 30 02:17:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1682143
Posted: Dec 17 2015 (23:29)

6 Responses
Last Response: Dec 18 2015 (02:47)
General Travel
5107 views
5

Dec 17 2015 (23:29)  
 
abhinivista
abhinivista   682 blog posts
Entry# 1682143               Past Edits
Modi's bullet trains are a waste of money, Indian Railways can't afford it
Government hasn't coughed up even a fraction of the Rs 8,00,000 crore outlay required to bring about much-needed modernisation of the dilapidated tracks.

Last Friday, India agreed to buy the Shinkansen high-speed bullet train from Japan to link Ahmedabad and Mumbai. The Indian cabinet swiftly cleared the $14.7bn (£9.6bn)
...
more...
cost of building the 650km-long bullet train system. Prime Minister Narendra Modi said: "This enterprise will launch a revolution in Indian railways and speed up India's journey into the future. It will become an engine of economic transformation in India". But will it?
To be sure the BJP's election manifesto, released on April 7, 2014, very specifically said if elected, the BJP government will launch "a diamond quadrilateral project of high speed train network (bullet train)". This quadrilateral, also known as the golden quadrilateral, linking the four big metropolises envisages a network of 5,846km. It joins Delhi, Chennai, Kolkata and Mumbai or North, South, East and West. But it doesn't include Gujarat's capital, Ahmedabad. Indian Railways (IR) is the third largest railway network in the world with 7,083 railway stations, 1,31,205 railway bridges, 9,000 locomotives, 51,030 passenger coaches, 2,19,931 freight cars and 63,974 route kilometres. Today, IR operates 19,000 trains each day, comprising 12,000 passenger trains and 7,000 freight trains. It transports 2.65 million tonnes of freight traffic and 23 million passengers every day and 7.2 billion passengers per year. It currently has 1.36 million employees and an annual revenue base of about Rs 1,20, 000 crore ($20 billion).
Railways have come a long way since the first passenger train service began on April 16, 1853, when 14 railway carriages carrying about 400 guests left Bori Bunder (Mumbai) at 3.30 pm "amidst the loud applause of a vast multitude and to the salute of 21 guns".
More than anything, the IR typifies the vast, creaking and dilapidated nature of India's infrastructure. At the root of this is that the IR hardly earns enough to pay for itself, let alone invest in modernisation and safety. The IR is cash strapped mainly due to the recurring losses in the passenger segment of its operations. Last year, it lost Rs 30,000 crore ($5 billion). The loss per passenger-km increased to Rs. 0.23. After adjusting the income it takes from freight, the railways is left with a surplus cash of just Rs 690 crore ($115mn).
Its top managers have frequently red-signalled the crisis. A top official said: "In the final analysis, the performance of the organisation would be just at the bottomline and unless we are in a position to control the expenditure and increase the earnings on a sustained basis, survival for the organisation becomes a very difficult proposition". But the railways get by every year with huge dollops of government funding and increasingly by postponing vital investments. For instance, important decisions, such as the filling of tens of thousands of safety-related posts like gangmen, pointsmen, signalmen and assistant station masters, keeps getting delayed. The consequences of this are seen in the burgeoning incidence of railways-related accidents and deaths.
Since 2000, there have been 89 major accidents and almost two-third of them since 2010. It is estimated is that almost 15,000 people die on tracks due to unlawful trespassing every year, of which about 6,000 are on the Mumbai suburban section. According to the Union home ministry records, 25,006 people died and 3,882 were injured in a total of 28,360 railway accidents across the country in 2014 alone.
The challenge was clear for many years. In 2012, a high-level committee recognised that the condition of the tracks and bridges is a cause of major concern since the weak tracks slow down the trains' movement, delaying freight. The committee tasked the IR to:1. Modernise 19,000km of existing tracks comprising nearly 40 per cent of the total network and carrying about 80 per cent of the traffic.2. Eliminate level crossings (by building rail over and under bridges) and provide fencing alongside tracks3. Strengthen 11,250 bridges to sustain higher loads at higher speeds, noting that about a quarter of out of 1,31,000 bridges are over 100 years old.4. Provide 100 per cent mechanised track maintenance on the main routes to allow for superior quality track-laying and maintenance.
But neither the IR nor the Indian government has so far been able to rustle up even a fraction of the Rs. 8,00,000 crores ($130 billion) outlay for this.
Shouldn't the focus be on modernising and upgrading the entire system? The question therefore must be, how does a bullet train joining Mumbai and Ahmedabad address any of these urgent needs?
On the face of it, the Japanese offer is very attractive. Japan has offered to meet 80 per cent of the Mumbai-Ahmedabad project cost, on condition that India buys 30 per cent of equipment including the coaches and locomotives from Japanese firms. In the coming years, up to 70-80 per cent of the components could be manufactured in India. The Japanese government has offered technical support and was willing to drive the local manufacturing and technology transfer initiative within a specified period, said sources. In addition, it has offered funding at 0.1 per cent, compared to the 0.3 per cent cap decided by India recently, with the tenure of the loan at 50 years, along with a 10-15 year moratorium. Of the total project cost, around Rs 17,000-18,000 crore would be the cost of land. These terms cannot be scoffed at.
But questions persist. Can this be the most competitive offer? Did the government even consider or invite other offers? How much are the Japanese going to make out of this? The purpose of competitive offers is to eliminate all these. But this due process was given a go by.
Finally, the big question that will not go away is whether the same investment on upgrading the entire Indian Railway network would be more economically beneficial than a single high cost project? India adds a million young people to its work force every month. There is little disagreement that the up gradation of the entire network would entail creation of many more new jobs than a single capital and import intensive project. How does this then tie in with Prime Minister Modi's hope that "it will become an engine of economic transformation in India"?

Source

Translate to English
Translate to Hindi

4 Posts

2586 views
0

Dec 18 2015 (00:11)guest
Re# 1682143-5              
because metro is affordable .. bullet train everyone cannot afford..
Translate to English
Translate to Hindi

2446 views
2

Dec 18 2015 (00:15)
Mridul^~
Mridul^~   46822 blog posts
Re# 1682143-6              
@1682143-5  @guest
YEs, fare structure now a days clearly looking too much high.
But Bullet trains will run with Electric Power, Low maintenance cost compare to plane.
So lets see.
Presently i am not supporting for long distance bullet corridores(Delhi-Mumbai, Delhi-Chennai)
But
...
more...
small corridore can be too much helpful in future, especially those cities who dont have high frequency flights.

Translate to English
Translate to Hindi

2258 views
1

Dec 18 2015 (02:03)guest
Re# 1682143-7              
so you think santa came early for IR in disguise as Shinzo Abe and that $12 billion was christmas gift ?
please read the fine lines and you will know the complete picture (bye the way, bullet train fares are close to air fares so out of reach of most of indians)
and it was tough month to forget, when literally trains (sub-urban to long distance) were derailing back to back, one after another. And one had to be supposedly "crashed" in open since it brakes had failed
I
...
more...
would have been more impressed had the govt given more priority on improving the current infra, or had the govt secured funding for 3rd, 4th line for existing tracks too

Translate to English
Translate to Hindi

2500 views
1

Dec 18 2015 (02:47)
abhinivista
abhinivista   682 blog posts
Re# 1682143-8              
Is-Se Tho Acha Existing Tracks Ko Upgrade Karte Fukat Ka 98000cr Kharch Karne Ka Kuch Matlab Nahin. As Per All News Articles Travel Time For Mumbai-Ahemedabad 2 Hrs And Mumbai-Delhi 5-6 Hrs On Bullet Train. Existing Train Shatabadi 6¼ Hrs Mumbai-Ahemedabad And Rajdhani Mumbai-New Delhi 15½ Hrs Lagta Hai Existing Track Ko Upgrade Kar Ke Mps 200 Aur Average Speed 90 Se 150 Kar Diya Jaye Tho Bct-Adi 3¼ Hrs Aur Mumbai-Delhi 9 Hrs Mein Pahucha Ja Sakta Hai.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy