#SecMaintenanceIssue of NR
Firstly, today H1 coach of Mumbai AC Express developed some problem delaying the train as reported by CR railfans from IRI.
If it was checked properly and replacements could be made like seen in the picture click here u can see Bangalore Rajdhani with WR EOG of while some other railfan had spotted AK Rajdhani with SWR EOG in comments.
This...
more... problem could be averted same way.
so, this means such shuffling of coaches irrespective of zones is done as a part of secondary maintenance!
Once 22109's AC coach was not working from CR side, as a result of which it was rescheduled n the new coach was arranged.
__________________________________________________ ________________________________________________________________________________
Secondly, one more similar incident is reported of Jhelum Express' 3AC coach being non functional forcing the travellers to travel without AC for hours for which FZR div of NR has paid the penalty.
click here__________________________________________________ ________________________________________________________________________________
Also, there was a case of broken wheel of from 22692 NZM to SBC Rajdhani Express, which was happened at NGP, where Hybrid LHB 3AC was provided as replacement for the 3AC SWR coach.
/blog/post/996856