No doubt karnataka is worst In Electrifying Rail lines This might be negligency by the old Zones which were handling karnataka previously those Zones did Double standards and developed thier State area itself so the Reaction for that Negligency is SWR Born out.Now State Govt Should put Strong pressure on RB for all these pipeline Projects to be completed by atleast 2020 as RM made statement as Complete Electrification of IR by 2020. The CPR officer Saying proposed Some lines like Bengaluru-UBL, GDG-Hotgi,Londa-Pune Electrification "WITH" Doubling what does this "WITH" means? Electrification will be carried on with doubling process side by side or after Doubling? If carried With Doubling side by side then it would be much better as it may complete both Electrification & doubling at a time.