Everyone one knows it when it comes to controlling WR is one of the best it treat the train as per schedule if train having tight schedule then it allow to give run as per its average speed in that section it does allow ot when necessary as no trolling as 12218 Kerala SK having average speed of 58 between kota to brc if come right time at kota WR run it slowly without effecting TT of other train and slowly steady it reach brc if comes heavily delayed then allow blast to make up delay as one day 12217 was late by 3.30 hrs when it reached vasai road WR territory from CR and kR by brc it make up around 10 mins at brc it was 3.20 hrs late and next morning reached kota just 20 mins delay I was shocked as make up 3 hrs delay as brc...
more... kota 525 km covered by 110mps train in busy section in 7.25 hrs average speed 82kmph so WR control the train as per their condition unlike others partial and trolling controlling do travel in kota Surat section u will witness the smart controlling of WR even every year it comes first in controlling as win award for controlling as 2018 punctuality rate of WR is 96% that is still low as WR thinks