News Entry# 0
*Diverted via MFP-PNYA-GKP with Diesel power jco. 11.06.19.
*1 Rake will be LHBfied from 09/04/2019 Ex Darbhanga. Kindly check the Reservation Charts/SMS sent from IR and Coach Number before boarding. Coach Composition of the LHB Rake is 1A-1/2A-2/3A-1/SL-12/EOG-2/GEN-3/PC-1. Coach position of the LHB Rake is LOCO-EOG-GEN-GEN-GEN-S1-S2-S3-S4-S5-S6-S7-S8-S9-S10-S11-S12-PC-B1-A1-A2-H1-EOG. *ICF Rake is running with Extra Sleeper coach named as SE1 between S13 & Pantry Car.