I think Malhour BBK line Quadrupling is not in sight of railway... Railway is acting slow in tripling and Quadrupling of existing congested double lines ЁЯШЖ so maybe we should reduce our demand to Malhour Barabanki line to triple it
But It is very urgent to build Quadruple line Between Lko to Dilkusha cabin and Railway should atleast make a plan for it ЁЯЩД They are ignorant about LKO.
Average 45 - 60 min Stoppage in LKO outer every time I traveled from here ЁЯШП