Anara was planned to house a large factory. Later multiple smaller ones came. To adjust them a freight yard was constructed on both sides. This yard compromised the mainline structure. However, SER has in mind to redo the alignment to let pass trains at MPS. Hopefully, with tripling the mainlines will be back along with additional platforms at ANR.