I don't see much difference between GT and Godavari speed post BZA. Godavari reached BT to RJY by 24 and AKP by 8 min, net it took 5 hr 2 min which would come around 70 kmph avg speed with 3 stops. Whereas GT took 5 hr 54 min which clocks around 73 kmph with 2 stops and 3 min BT at Ongole. You know disadvantage for vskp bound trains , until they reach Gunadala/Mustabad they have to crawl can't run at MPS, that is reason all trains in this section generally late to EE or RJY. Whereas for MAS bound trains, movement they leave BZA they are on to main line and go with MPS. And I agree 2728 in BZA-VSKP nothing better than a fast passenger. It has almost all stops MTM fast passenger is having.