1. Regular weekly SF train to SMVB at first and then increasing the frequency to Bi weekly.
2. Weekly SF train to BSB via VZM, TIG,SBP,ROU,RNC, TRI,DDU.
3. LHBfication of weekly SF train to LTT via VZM, R,NGP MMR
4. Running of MEMU to BAM Or IPM or PSA in the morning at 8.00