The train left NDLS exactly on time. 1A coach is clean, one seat coming on at Jhansi tonight, and 2 seats getting off at Kopargaon in the Coupe H. Our WAP7 had some power issues, and first the HOG was switched off, then the entire engine was replaced by a WAG9! All pics of the trip here https://photos.app.goo.gl/efJLbYpeNtoVqQDp6
[@DD-ELS: Daund Electric Loco Shed]
&27 km/h loooong stop in DD. no idea why.