The train was planned to be a Daily. But the Railway Board backtracked from the plan. The train has huge demand. Rake arrangement is the main obstacle in increasing the frequency of the train.
1.Till the LHB coaches are made available special service with ICF coaches can be run to be sure of Demand.
2. B5 should replace S11 in the train.
3....
more... Running Time should be reduced between Ernakulam and CAPE for the DBRT- CAPE .