Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon May 20 05:07:56 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 5602560
Posted: Jan 16 2023 (11:17)

27 Responses
Last Response: Jan 17 2023 (02:04)
General Travel
64969 views
5

Jan 16 2023 (11:17)   20833/Visakhapatnam - Secunderabad Vande Bharat Express | BZA/Vijayawada Junction (10 PFs)
VIJAY~
VIJAY~   1065 blog posts
Entry# 5602560            Tags  
#vandebharat

Visakhapatnam-Secundrabad 1st commercial run
Reach Vijayawada early by 15 minutes.
Actual arrival 09.45 AM
Schedule
...
more...
arrival 10.00 AM
350 kms run in 4.00 hours Avg=87.5 KM/Hr

From Vijaywada train is running late by 40 minutes and reasons unknown , yet to arrive khammam.

Translate to English
Translate to Hindi

22 Posts

25025 views
1

Jan 16 2023 (23:46)
VIJAY~
VIJAY~   1065 blog posts
Re# 5602560-23              
Summary of Day 1 run :
1)Beyond expectations arrived Vijayawada 10 minutes before time with an avg speed of 87.5 KM/HR.Great run between VSKP-RJY-BZA.

2)Platform 1 to Warangal main line crawling at BZA + ahead frieght traffic caused 40 Minutes delay to reach Khammam station.
...
more...

3) Good pickup of speed and slack ensured only 15 minutes delay.

RETURN JOURNEY

1) Started 05 minutes late and maintained ON time till Khammam. BZA N West ,BZA bulb cabin crawling caused 10 minutes delay to reach BZA PF1. Departed 19.25

2) Crawling continued till Gunadala and maintained good run later. RJY crawling continued till Kesavaram might be due to frieght traffic ahead.

3) Burning of track started from there till Duvvada.

Reached VSKP 5 minutes early.

Covering BZA-VSKP in 4.05 hours. (Had Dep from BZA is around 18.30 VSKP arrival 22.45 it would have been a flight killer).

Translate to English
Translate to Hindi

24692 views
2

Jan 17 2023 (01:21)
LGDHOGWAP737085^~
LGDHOGWAP737085^~   697 blog posts
Re# 5602560-24              
Well. I was on board 18519 VSKP to SC. 18519 departed BZA at 9.55 and while gaining 110 speed at RYP immediately ACP happened due to some family boarded wrong train and for reset of ACP and train got start back it took 10-12mins and by that time VB started from BZA Nd was tale of 18519.. and for sake of VB all mainline were clear and Unfortunately due to friegths blocking the loops 18519 had to be ahead till Chintakani and at Chintakani 18519 took reverse Loop fot tasting the VB 130kmph OT and in all this game before 18519 there was TPTY SC AC Special running by 8hrs late ( Due to RS from TPTY , as 22706 came late due to fog ). This AC special departed BZA 8.30 and reached MDR 10.20 so it trolled 18519 from there and later the AC special arrived at MABD and...
more...
got OT by VB and the delay of 48mins got reduced to 38mins by WL. After clearing the path towards KZJ post KZJ it got clearance fully and slack utilisation helped and made reach VB at SC PF 10 by 12mins late. Unfortunately 18519 got trolled by AC Special from MABD to MLY badly as almost all loops were blocked.

Translate to English
Translate to Hindi

23858 views
1

Jan 17 2023 (01:27)
LGDHOGWAP737085^~
LGDHOGWAP737085^~   697 blog posts
Re# 5602560-25              
In KI towards BZA some finishing works being done due to which trains from morning towards BZA in MDR BZA got delayed
Translate to English
Translate to Hindi

22676 views
3

Jan 17 2023 (01:46)
VIJAY~
VIJAY~   1065 blog posts
Re# 5602560-26              
Well explained :)

Hope such blocking incidents doesn't happen regularly and looking at loop line constraints some where near Gangineni, Yerrupalem SCR can plan a mega loop line yard such that passenger trains doesn't encounter loop line constraints and multiple frieght trains can be sent in order once path is reserved for goods movement.
Translate to English
Translate to Hindi

25147 views
1

Jan 17 2023 (02:04)
VIJAY~
VIJAY~   1065 blog posts
Re# 5602560-27              
A Jam packed VSKP-BZA-SC #Vandebharat 20833 will run today. Many passengers in telugu states will get taste of new age train set.

Looking at charts at VSKP 40% End-End passengers & 40% BZA deboarding passengers (Will be filled by SC bound passengs again from here) . There is a good demand from RJY (Feel sorry for less quota).
...
more...

I will not wonder in future if SLO gets an experimental halt. (General location chart if allocated will fill train even on off days from SLO, RJY) .

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy