Funds for Railway safety getting diverted for VB train making. VB trains can wait, Railway safety is must. For your information after 12301/02 in 1969, 12951/52 was introduced in 1972. The until 1990, no other Rajdhani train was inaugurated. Same for Shatabdi, after 1st Shatabdi train in 1989, next Shatabdi train came in 1994/95. See newspaper reports .