If a train runs 6000 kms up and down then initially pm is done and after reaching destination maintenance is done which is called as secondary maintenance and after coming back to the source again pm is done before sending the rake
OEA in simple words is locking the rake, cleaning the rake (dust and garbage) and water filling at the destination point