बिलासपुर जोन में 14.3 KM तीसरी लाइन तैयार:अनूपपुर से कटनी तक लाइन बिछाने का चल रहा काम; स्पीड ट्रायल के बाद चलेंगी ट्रेनेंThe Bilaspur Railway Zone is currently constructing a third line between Anuppur and Katni, spanning 165.52 kilometers. A 14.3 kilometer section between Singhpur, Shahdol, and Bhandwapara has been completed. The Railway's Safety Commissioner, B.K. Mishra, inspected the new line, conducting speed trials with an observation car.
Bilaspur Railway Zone mein Anuppur se Katni tak 165.52 kilometers ka third line ka kaam chal raha hai. Ismein se Singhpur, Shahdol aur Bhandwapara ke beech 14.3 kilometers ka kaam pura ho gaya hai. Railway ke Safety Commissioner, B.K. Mishra ne new line ka inspection kiya aur observation car ke saath...
more... speed trial bhi kiya.