Railway administration should enhance facilities at Bhopal Jn. such as:
1) Construction of new pit lines and yards. It has 3 pit lines in yard out of which only one is suitable for 24 coach train.
2) Increase in length of some platforms especially PF#3,4,5 and 6 which is not yet suitable to accommodate a 24 coacher train. Trains placed on these platforms usually have 1-2 coaches parked outside platform causing inconvenience to passengers.
3)...
more... PF#1,2 and 3 is mostly utilized for maximum traffic in both the directions and rest other platforms are under utilized causing train delays and congestion due to non-availability of platforms. During evening time, there is heavy rush at PF#1 with back to back trains' arrival.
4) Display boards and coach display indicators do not work properly many a times and misguide the passengers.
5) Trains bypassing BPL should be given a regular halt at BPL since SHRM is very far and does not have proper passenger facilities. Also the approach road to SHRM is very thin causing heavy traffic jam.
6) Can also construct 2 additional PFs between PF#3 and PF#4 by eliminating the central line similar to what JBP did.