GL. going on from Daurai side
work is slow
🔹Mangliyawas - Bangurgram Halt
▪ Foundation work for electrification is Been carried out at slow pace.
🔹Bangurgram halt - Beawar
▪ GL going on from Bangurgram halt side ,
▪ Nothing at Beawar outer.
🔹Beawar - Amarpura
▪ Bridge work has started i.e. Bridge layout is been carried out,
▪ Sleepers had arrived here for Doubling
▪ GL not started yet
🔹Amarpura - Sendra
▪ GL started for approx 200m
🔹Sendra - Bar
▪ Sleepers arrived ,
▪ GL started at intermediate location ,
▪ major bridge work not started yet
🔹Bar - Haripur
▪ GL started At Full pace
foundation for layout of bridge has started
🔹Haripur - Guriya
▪ Double line will get commissioned from 21/6/18 (approx.)
Electric poles can be seen post Haripur stsn on Both sides
🔹Guriya - Chandawal - Bagri sajjanpur
▪ wiring done on Both sides (incl. station) ;Tightening remaining.
🔹Bagri Sajjanpur - Bagri Nagar
▪ Complete wiring done.
🔹Bagri Nagar - Sojat Road
▪ Wiring done intermediately ,
At some location (Bracket tube & Stay tube) Installed with Catenary wire.
▪ No poles erected on bridge
🔹Sojat Rd. - Dhareshwar
▪ Complete Wiring done for electrification
🔹Dhareshwar - Marwar Jn.
▪ At max. location (Bracket tube & Stay tube) Installed {excl. Marawar jn Pf from both ends}
🔹Marwar jn. - Auwa
▪ Intermediate wiring done,
At Some place (Bracket tube & Stay tube) Installed
At some extinct poles not fixed yet (loose condition)
▪ Poles has been install at auwa stsn
🔹Auwa - Banta RaghunathGarh
▪ No poles erected , only foundation work Done for poles
🔹Banta RaghunathGarh - Bhinwaliya
▪ poles erected fixing remaining ...
🔹Bhinwaliya - Somesar
▪ GL done, bridge constructed but track not layed
▪ No sign of electrification
🔹Somesar - Jawali - Bhagwanpura
▪ GL done, bridge constructed but track not layed
▪ sleepers Arrived , not layed
🔹RANI Outer ..:
▪ bridge layed GL done no sleeper layed yet
▪ Double line commissioned of existing Pf1 Line , now new loop line is constructed At the left side of Pf#1 , for which Many Shops and other Small buildings are been broken .
🔹Bhagwanpura - Rani
GL done, Bridge Construction going on
No track layed on the bridge .
▪️ sleeper laying work in progress , with
stone laying done entirely (excl. Rani outer) .
🔹Rani - Falna
▪ No sign of electrification
▪ loop created on LHS of main pf at Falna
🔹Falna - Jawai Bandh
▪ No sign of electrification
▪ jawai bandh loop creation work in progress on LHS of pf#1
🔹Jawai Bandh - Sirohi Rd - Bhimana
▪ foundation work done for poles i.e.
▪ Creation of holes
🔹Bhimana - Kivarli
▪ only 10% doubling work done
▪ Major bridge work not started
🔹Kivarli - Morthala
▪ Second line layed partially .
▪ at some extent GL also not done
▪ Holes created rarely.
🔹Morthala - Abu Road
▪ Intermediate second track layed approx2-3 Km
▪ GL in progress
▪ major bridge Work in progress
▪ No sign of electrification .
🔹Abu Road - Maval
▪ 3km approx. track layed
▪ Bridge Work in progress
▪ electrification on full swing near maval.
▪ Doubling work also at good pace .
from both ends , Full effort inserted for doubling this line .
▪ A small patch is not parallel to existing line. (wide gap)
🔹Maval - Karjoda
▪ single line wiring done
GL Going on for doubling
🔹Amirgadh - Jethi
▪ Second line layed,
▪ Single line electrification done
Chitrasani - Palanpur
▪ GL Work in progress
🔹PALANPUR. .:
▪ no wires at Palanpur stsn.
▪ Poles are layed , (stay tube & bracket tube Installed)
wires not reached yet main station.
▪ Wires are till Umardashi at one end and at Karjoda on other end .
🔹Palanpur - Mahesana
▪ intermediate GL started
Near Kamli and Unjha
🔹Near Ambliyasan
▪ GL going on with JCB. as part of
(Adi MSH
#GC)
🔹Ambliyasan - Dangarwa
▪ GL done 80%
🔹Dangarwa - Kalol
▪ Old MG track got removed , except Level crossing at some extinct
🔹Kalol - Khodiyar
▪ GL going on , bridge work is relatively slow compared to NWR .
🔹Khodiyar - Chandkhera Road.
▪ New BG track laying is going on ;
mostly Track layed
🔹Chandkhera Rd - Sabarmati
▪ GL going on
▪ Laying of Sleeper Started (where GL done)
▪ Old MG track are still present at SBI Pf
#AhmedabadAjmerDoubling#AhmedabadDelhiElectrification