Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Jun 12 20:23:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    11 Blog Entries  <<prev  
1 Followers
Info Update
28998 views
20

★★★
Aug 26 2018 (22:21)   AII/Ajmer Junction (6 PFs)
BRCWAP7~
BRCWAP7~   13281 blog posts
Entry# 3752193            Tags   Past Edits
1 compliments
Superb update
29 MAY 2018 Beawar :
⭐ North Western Railways 〰️ AJMER division ⭐
Detailed Update of Doubling and Electrification Of
🔸🔹[ AJMER - AHMEDABAD ] 🔹🔸
🔹Ajmer - Daurai
...
more...
GL. going on from Daurai side
work is slow
🔹Mangliyawas - Bangurgram Halt
▪ Foundation work for electrification is Been carried out at slow pace.
🔹Bangurgram halt - Beawar
▪ GL going on from Bangurgram halt side ,
▪ Nothing at Beawar outer.
🔹Beawar - Amarpura
▪ Bridge work has started i.e. Bridge layout is been carried out,
▪ Sleepers had arrived here for Doubling
▪ GL not started yet
🔹Amarpura - Sendra
▪ GL started for approx 200m
🔹Sendra - Bar
▪ Sleepers arrived ,
▪ GL started at intermediate location ,
▪ major bridge work not started yet
🔹Bar - Haripur
▪ GL started At Full pace
foundation for layout of bridge has started
🔹Haripur - Guriya
▪ Double line will get commissioned from 21/6/18 (approx.)
Electric poles can be seen post Haripur stsn on Both sides
🔹Guriya - Chandawal - Bagri sajjanpur
▪ wiring done on Both sides (incl. station) ;Tightening remaining.
🔹Bagri Sajjanpur - Bagri Nagar
▪ Complete wiring done.
🔹Bagri Nagar - Sojat Road
▪ Wiring done intermediately ,
At some location (Bracket tube & Stay tube) Installed with Catenary wire.
▪ No poles erected on bridge
🔹Sojat Rd. - Dhareshwar
▪ Complete Wiring done for electrification
🔹Dhareshwar - Marwar Jn.
▪ At max. location (Bracket tube & Stay tube) Installed {excl. Marawar jn Pf from both ends}
🔹Marwar jn. - Auwa
▪ Intermediate wiring done,
At Some place (Bracket tube & Stay tube) Installed
At some extinct poles not fixed yet (loose condition)
▪ Poles has been install at auwa stsn
🔹Auwa - Banta RaghunathGarh
▪ No poles erected , only foundation work Done for poles
🔹Banta RaghunathGarh - Bhinwaliya
▪ poles erected fixing remaining ...
🔹Bhinwaliya - Somesar
▪ GL done, bridge constructed but track not layed
▪ No sign of electrification
🔹Somesar - Jawali - Bhagwanpura
▪ GL done, bridge constructed but track not layed
▪ sleepers Arrived , not layed
🔹RANI Outer ..:
▪ bridge layed GL done no sleeper layed yet
▪ Double line commissioned of existing Pf1 Line , now new loop line is constructed At the left side of Pf#1 , for which Many Shops and other Small buildings are been broken .
🔹Bhagwanpura - Rani
GL done, Bridge Construction going on
No track layed on the bridge .
▪️ sleeper laying work in progress , with
stone laying done entirely (excl. Rani outer) .
🔹Rani - Falna
▪ No sign of electrification
▪ loop created on LHS of main pf at Falna
🔹Falna - Jawai Bandh
▪ No sign of electrification
▪ jawai bandh loop creation work in progress on LHS of pf#1
🔹Jawai Bandh - Sirohi Rd - Bhimana
▪ foundation work done for poles i.e.
▪ Creation of holes
🔹Bhimana - Kivarli
▪ only 10% doubling work done
▪ Major bridge work not started
🔹Kivarli - Morthala
▪ Second line layed partially .
▪ at some extent GL also not done
▪ Holes created rarely.
🔹Morthala - Abu Road
▪ Intermediate second track layed approx2-3 Km
▪ GL in progress
▪ major bridge Work in progress
▪ No sign of electrification .
🔹Abu Road - Maval
▪ 3km approx. track layed
▪ Bridge Work in progress
▪ electrification on full swing near maval.
▪ Doubling work also at good pace .
from both ends , Full effort inserted for doubling this line .
▪ A small patch is not parallel to existing line. (wide gap)
🔹Maval - Karjoda
▪ single line wiring done
GL Going on for doubling
🔹Amirgadh - Jethi
▪ Second line layed,
▪ Single line electrification done
Chitrasani - Palanpur
▪ GL Work in progress
🔹PALANPUR. .:
▪ no wires at Palanpur stsn.
▪ Poles are layed , (stay tube & bracket tube Installed)
wires not reached yet main station.
▪ Wires are till Umardashi at one end and at Karjoda on other end .
🔹Palanpur - Mahesana
▪ intermediate GL started
Near Kamli and Unjha
🔹Near Ambliyasan
▪ GL going on with JCB. as part of
(Adi MSH #GC)
🔹Ambliyasan - Dangarwa
▪ GL done 80%
🔹Dangarwa - Kalol
▪ Old MG track got removed , except Level crossing at some extinct
🔹Kalol - Khodiyar
▪ GL going on , bridge work is relatively slow compared to NWR .
🔹Khodiyar - Chandkhera Road.
▪ New BG track laying is going on ;
mostly Track layed
🔹Chandkhera Rd - Sabarmati
▪ GL going on
▪ Laying of Sleeper Started (where GL done)
▪ Old MG track are still present at SBI Pf
#AhmedabadAjmerDoubling
#AhmedabadDelhiElectrification

Translate to English
Translate to Hindi

1 Public Posts - Sun Aug 26, 2018
Page#    11 Blog Entries  <<prev  

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5003683 ★★★ 53guest
5955786 ★★★ 38fanof12801~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy