Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Jun 28 19:46:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1617340
Posted: Oct 14 2015 (23:39)

5 Responses
Last Response: Oct 17 2015 (15:08)
2 Followers
Info Update
10645 views
11

Oct 14 2015 (23:39)   SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs) | GMO/WAP-7/30204
 
guest   6387 blog posts
Entry# 1617340            Tags   Past Edits
#railwayengineering
Ref:/blog/post/1405466
******** Some New Equipment For 3-Phase Locomotive(WAP-5/WAP-7/WAG-9) manufactured by Advanced Rail Control Ltd Bangalore *******
A FIRE DETECTION UNIT:
The Fire Detection Unit developed by us will be suitable for WAP5, WAP7
...
more...
& WAG9 classes of locomotives and its variants. It is fitted inside the machine room of Locomotive to detect smouldering fires as well as flaming fires that produce smoke. Fire Detection Unit gives an alarm warning signal to Cab-Pilot along with the LED indication.Fire Detection Unit contains two smoke detectors, suction unit with air-flow monitoring, visual indication of Operation, fault/malfunction, Alarm, connection for pipe with 25mm outside diameter, potential free relays. The unit works at nominal voltage of 24V DC.
Link: click here (Link of attached image also)
B: PRESSURE SENSOR:
The Pressure sensor is made of piezo-resistive pressure sensor packaged in surface mount configuration and attached to a ceramic substrate, capable of an operating temperature(fluid temperature) of -40°C to +125°C. The sensing element associated with the amplifier and current converter,housed in a printed circuit board, will be embedded in a stainless steel housing. Packaged pressure sensor will work as a two wire sensor providing 4-20mA output corresponding to 0..4 bar pressure.
The differential amplifier will be housed in an aluminium enclosure. The differential amplifier has two input channels and each of these input channel can accept a 4..20mA signal coming from the pressure sensor. The output of the amplifier is the difference of the two input pressures(differential) and is provided as 4..20mA signal. Both input and output signals are connected to the amplifier through 5 pin circular connectors of type KPSE06E14-5S and corresponding mating receptacle in the amplifier housing.
Link: click here (Link of attached image also)
C MASTER CONTROLLER :
The Master Controller developed by us will be suitable for WAP5, WAP7 & WAG9 classes of locomotives and its variants. It works using a different principle as compared to the master controllers currently being used in these classes of locomotives. The master controller has essentially three functional components, viz. (i) Angle Transmitter, (ii) CAM operated switches to sense TE (or BE), ZERO position, 1/3 position, 2/3 position & (iii) Forward/Reverse selector switch, which also has CAM operated switches and mechanically interlocked with the throttle handle.
The heart of the master controller is the angle transmitter, which is expected to provide a current output (4-20mA) proportional to the angle position of the throttle handle. We have developed a angle encoder using Contact less rotary position sensor over 360°. It has huge advantage compared to the currently being used.
Link: click here (Link of attached image also)
D LOCOMOTIVE DIAGNOSTIC SYSTEM :
Locomotive Diagnostic Tool (Model LDS-04) was developed for trouble shooting and online diagnosis of the 6000 HP modern three phase locomotive fleet of Indian Railways equipped with MICAS-S2 control system of Bombardier Transportation. The equipment is built around a Pentium class processor and has a communication gateway enabling direct connection to the locomotive control system through the Multifunctional Vehicle Bus (MVB). The diagnostic tool becomes a network node on the MVB and all the vehicle processors can be accessed. The entire suite of MicTools (proprietary traction control software tools of Bombardier Transportation) can be run on this equipment to carryout many functions like control software download, fault log upload cum offline analysis, visualization and temporary forcing of process variables in real-time etc. The equipment is very compact, chassis cooled with dual input supply option of 110V DC and 230V AC 50Hz. USB interface and dual boot feature (DOS & Windows) are its unique features.
Link: click here (Link of attached image also)
E FUNCTIONALLY EQUIVALENT PCBs :
The present running 3-phase Electrical Locomotives using the design of MICAS S2 class of Electronic PCB’s are of late 1980’s vintage. Many components have already been declared obsolete by the OEM’s years ago. Due to this, the genuisness of many parts which are currently being purchased is not very certain. The failures are likely to increase in future and maintenance could be a serious problem.
To overcome such difficulties we have undertaken re-design of MICAS S2 electronic PCB’s retaining the same functionality and straight-away interchangeable. In this connection we have already developed 3 types of PCB’s namely: 1. AR B705 B01 Signal Routing Board 2. UF B660 A01 MVB Bus Coupler Board 3. UF B701 A01 Bus Coupler Board.
Link: click here (Link of attached image also)
Attached Images:
FIRE DETECTION UNIT
PRESSURE SENSOR
MASTER CONTROLLER
LOCOMOTIVE DIAGNOSTIC SYSTEM
FUNCTIONALLY EQUIVALENT PCBs

Translate to English
Translate to Hindi

4 Posts

2935 views
4

Oct 17 2015 (14:38)
indian railways   7174 blog posts
Re# 1617340-8              
Have a look at the ultra-modern cabs of EMD WDG4D 70356 :)
They are air conditioned as well.
Translate to English
Translate to Hindi

3278 views
2

Oct 17 2015 (15:08)
guest   6387 blog posts
Re# 1617340-9              
amazingly superb.....
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy