On 25th October I was onboard 12003 from LJN and noticed a few things like it took an unusual route from LJN to mkg like trains going towards MB do but turned away from the LNWT cabin . Took the down line instead of up upto mkg as the down line was blocked because they were changing the tracks . The old tracks were being cut off one part at a time and was being loaded onto a goods train where originally new tracks were present as you can see in this video. Then it did continuous run of 105-110 kmph b/w mkg and cpb except at unnao which was skipped at 100 kmph and reached 3mins early at cnb.it did mkg cpb section at an exact average of 99kmph