It is better to have a new line between KPD and BWT.. I estimate that it reduces the distance between BLR and CHN by 70km, which means travel time reduction by an hour to the passengers. It can also reduce the load of KPD - JTJ section, which is a bottle neck for SBC and CBE trains..