Cherlapally terminal construction latest update
Cherlapally already has 5 pfs (2 local mmts and 3 long distance trains)
As part of terminal 4 more pfs are bieng added
Out of which 2 pfs are looking like dead end (terminating)platforms due to land problems and 2 new pfs are bieng connected to sc-kzj main line by acquiring land from petroleum compaines
And...
more... 4 pit lines are bieng added..and 2 lines for ioh shed
Huge parking lot and big station building is constructed at southern side of station.. already North side has station building
Details with pictures
1) new pfs 6,7,8,9 with pit lines in background
2) and 3) new pfs terminated near petrol company
4)pf towards kazipet side
5)ioh shed details in background
6)hp gas lorry passing through the under construction railway bridge
7) and 8) railway yard from railway bridge view
9) and 10) and 11) new platforms as part of mmts
12)newly constructed signalling cabin with station board as part of mmts
13) 14) and 15) locos coming out of petrol company ,new pf dead can be seen most probably diamond crossing would be build
16),17)and 18) a separate parking and a line used for shifting trains from pitlines to platform without distrubing main line traffic having capacity of 26 coaches is bieng built
19) again a new parking line behind the station yard parking line built at fci godown with length of 9 coaches most probably engines will be stopped here or mmts trains will be parked here