Blog Entry# 6014867
Posted: Mar 31 (13:10)
19 Responses
Last Response: Mar 31 (14:57)
inspecting the Electrification (RE) status between NCB - DBB ЁЯдЮЁЯдЮ
@TFGN: Tufanganj 2 km <--> 5 km @BXHT: Boxirhat 64km/h 3h 58m late@TFGN: Tufanganj &65 km/h speeding up