The running time can be decreased by 90mins making 18hrs journey. SC to GTL is ok after that needs speed upgrade. The dep can be delayed to 1405 and arrival at Vasco to 815. Even from Vasco the timings should be 1400 with SC arrival 800. As per present schedule Hubli 2205/15 Londa 2400 Vasco 415.