Instead of new trains, they can make two existing trains SF category, Udyan express and LTT - Coimbatore and cut down travel time to 17 hours between LTT and Bangalore. The number of intermediate stops are too many for these two trains and can actually make them to run in 16 to 17 hours without any changes to operating speeds.