Allp station doesnt have a full fledged pit line which can manage 22 coaches. What they have is a shorter one. SM of 13352 is done in Allp. I have heard the following
(1) Through extension this will reduce a dedicated set of people from Mechanical section who are deployed at Allp only for this train.
(2) By extending to KCVL, stations like...
more... KYJ, Kollam, TVC will get daily direct connection to East.
(3) As of now train almost gets vacant at Ernakulam. This can be a good option for a train from Allp to TVC for local commuters
(4) Return timings at KCVL is very odd though
please wait...Translate to EnglishThe Allp station doesn't have a big enough pit line for 22 coaches. They've only got a small one. The SM work for train number 13352 is done at Allp. I've heard a few things:
(1) If they extend it, it'll free up some folks from the Mechanical section who are currently stuck at Allp just for this train.
(2) Extending it to KCVL will give daily direct connections to East for stations like KYJ, Kollam, and TVC.
(3) Right now, the train is almost empty at Ernakulam. This could be a great choice for a train from Allp to TVC for local commuters.
(4) The return times at KCVL are pretty weird though.