Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Sep 19 09:59:47 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6184565
Posted: Sep 10 (09:37)

2 Responses
Last Response: Sep 11 (11:41)
Rail News
5401 views
0

Politics
SWR/South Western
Sep 10 (09:37)   Bengaluru Suburban Railway Project to Complete Half by December 2026

karbang~   1804 news posts
Entry# 6184565         Tags   Past Edits
Half of Bengaluru Suburban Railway Project will be ready by Dec 2026, says Somanna

The Bengaluru Suburban Railway Project (BSRP) aims to complete half of its 148.17-km network by December 2026, focusing on Corridors 2 (Mallige Line) and 4 (Kanaka Line). The project is jointly funded by Karnataka and the railways, along with loans from German and European banks. Officials have been directed to...
more...
complete land acquisition within three months. The meeting also discussed other railway projects in Karnataka, including a new line connecting Chitradurga and Vijayapura, expediting the Hubballi-Ankola line, doubling the Bengaluru-Hassan-Mangaluru line, and constructing a tunnel track between Sakleshpur and Subramanya Road. The state will soon hand over land for the Dharwad-Kittur-Belagavi line, and land acquisition is nearing completion for the Tumakuru-Rayadurga and Tumakuru-Chitradurga-Davangere lines. A new line connecting Hejjala and Chamarajnagar has also been announced. The railways will fully fund and complete the construction of Road Over Bridges (ROBs) and Road Under Bridges (RUBs) in Karnataka within two years.

Bengaluru Suburban Railway Project (BSRP) ka 148.17-km network ka aadhha part December 2026 tak complete karne ka target hai, jismein Corridor 2 (Mallige Line) aur 4 (Kanaka Line) pe focus hai. Project Karnataka aur railways ke saath, German aur European banks se loan leke funded hai. Officials ko land acquisition three...
more...
months mein complete karne ka order diya gaya hai. Meeting mein Karnataka mein aur railway projects pe bhi baat hui, jismein Chitradurga aur Vijayapura ko connect karne wali ek nayi line, Hubballi-Ankola line ko jaldi complete karna, Bengaluru-Hassan-Mangaluru line ko double karna, aur Sakleshpur aur Subramanya Road ke beech tunnel track banana shamil hai. Dharwad-Kittur-Belagavi line ke liye state jaldi hi land de dega, aur Tumakuru-Rayadurga aur Tumakuru-Chitradurga-Davangere lines ke liye land acquisition almost complete ho chuka hai. Hejjala aur Chamarajnagar ko connect karne wali ek nayi line bhi announce ki gayi hai. Railways Karnataka mein Road Over Bridges (ROBs) aur Road Under Bridges (RUBs) ke construction ke liye pura paisa dega, aur yeh sab two years mein complete ho jayenge.

1 Public Posts - Tue Sep 10, 2024

1399 views
0

Sep 11 (11:41)
irifan2015~
irifan2015~   2504 blog posts
Re# 6184565-2              
3 kms airport link took 15 years and still in progress.
This BSRP will take 60 years.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy