Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri May 17 15:45:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Blog Posts by nvnydv
Page#    10 Blog Entries  next>>
General Travel
18980 views
7

Aug 16 2023 (17:57)   KRNT/Kurnool City (3 PFs)
RanvirSiddhanth~
RanvirSiddhanth~   1686 blog posts
Entry# 5799674            Tags  
2 compliments
Useful Great:hope positive from CENTRAL GOVT
Finally doubling between mahaboob Nagar and dhone is approved by cabinet
Translate to English
Translate to Hindi

4 Public Posts - Wed Aug 16, 2023

8106 views
0

Aug 16 2023 (21:23)
nammabellari
nammabellari   13 blog posts
Re# 5799674-5              
Yes this will be totally bluff still now they are not utilising full fledged railway line which already completed like raichur to gadwal ,devrakadra to Krishna lines and they are saying inorder to avoid the traffic and better transport for coal as this is all unbelievable and not genuine.Per suppose if they are willing it will target 2030 this will be sure.
Translate to English
Translate to Hindi

1 Public Posts - Wed Aug 16, 2023

3 Public Posts - Fri Aug 18, 2023
General Travel
46276 views
6

Jul 31 2023 (15:01)   20703/Kacheguda - Yesvantpur Vande Bharat Express | YPR/Yesvantpur Junction (6 PFs)
RoyalIndianRailways
RoyalIndianRailways   467 blog posts
Entry# 5787540            Tags   Past Edits
The most awaited time had arrived kacheguda Bengaluru vande Bharat express likely to start in aug 6th .today trail run had been conducted .but don't know about halts .
Translate to English
Translate to Hindi

1 Public Posts - Tue Aug 01, 2023

12 Public Posts - Wed Aug 02, 2023

7 Public Posts - Thu Aug 03, 2023

10410 views
1

Aug 03 2023 (21:06)
nammabellari
nammabellari   13 blog posts
Re# 5787540-21               Past Edits
As I see if time and speed is the major importance then the railway authority may introduced this train via RC as it wil take entirely doubling route except gadwal to mahoobnagar as this easily cover in 7 hrs of journey.Also there is eagerly waiting for electrification completion between krishna & devakadra once the line is opened then maximum route can be treated doubling (Grand Trunk Route) where one opens for incoming from krishna and other side line can be use as outgoing from gadwal to raichur route.Due to this constraint only as the approval was not given for machilipatnam to kurnool extension upto raichur.

Since
...
more...
the problem as the coach belong to scr so maximum importance given to KRNL to dhone route.

Path1: Via gooty as this the passenger train and no stop will be provided at gooty and passing simply on this route without any income will not be benefitted to railway.There may be the passengers where used to travel partailly like kcg to kurnool,kcg to guntakal ,kurnool to anatapur as this will increase some profits to the railway.

Path2:Via Guntakal will be give more benefits to railways interms of passengers and renumeration. Since guntakal is surrounded by three major cities like Adoni,Raichur,Mantralayam & Bellary.So chances of making from mini VB to vb18 is also more.
Last but not least recent build of bypass as railway constructed for benefitting to railways & passengers.So Skipping Guntakal divsion will leads to railways negative profits.

hope everyone are clear.

Also doubling between gadwal to dhone will take another 4 to 5 years or may be useless as due to krishna to devakadra & rachur to gadwal future full swing route.

Example If any one clarifies why every train stops at Vizag and take loco reversal and continue for further journey due to this are we not missing the time and distance here or due to passengers convenient sake?

Translate to English
Translate to Hindi

1 Public Posts - Fri Aug 04, 2023

1 Public Posts - Thu Aug 10, 2023
General Travel
490918 views
9

Aug 01 2023 (09:42)   17603/Kacheguda - Yelahanka Express (PT) | GTL/Guntakal Junction (7 PFs)
VinodArvind~
VinodArvind~   3428 blog posts
Entry# 5788039            Tags   Past Edits
1 compliments
Useful
🔶 Change of working pattern and coach position.
n view of Newly Commissioned Bypass line with Twin Single line between GTL-MLGT, following are the changes in
🔸working pattern of Express Trains and
🔸 traction:
Translate to English
Translate to Hindi

12 Public Posts - Tue Aug 01, 2023

11727 views
1

Aug 01 2023 (22:08)
nammabellari
nammabellari   13 blog posts
Re# 5788039-18               Past Edits
If New VB will not touch then what was the issue to wait this many days since there route already electrified and clear to pass via gooty.
But now after electrification and new bypass completion why they are announced to introduce this VB also what was the constraint for department to think or skip GTL .Since you are new GM so just want to clarify with you sir could you please let us know the constraints or difficulties which is causing to think more on gtl route.I guessing for you to travel from kurnool to bellary via Bangalore as u need to spend additional 5 rupees on to ticket cost?
Translate to English
Translate to Hindi

3 Public Posts - Wed Aug 02, 2023

1 Public Posts - Thu Aug 03, 2023

3 Public Posts - Sat Aug 05, 2023

1 Public Posts - Wed Aug 23, 2023
General Travel
29437 views
7

Jul 25 2023 (19:11)   GTL/Guntakal Junction (7 PFs)
RanvirSiddhanth~
RanvirSiddhanth~   1686 blog posts
Entry# 5783267            Tags  
1 compliments
Great
CRS, SC circle inspected guntakal bypass line connecting dhone guntakal with adoni-guntakal. Also, doubling between maddikera to mallappagate also completed. Source: twitter handle of DRM, GTL
click here

#moderator #admin
Translate to English
Translate to Hindi

1 Public Posts - Thu Jul 27, 2023

4482 views
1

Jul 27 2023 (21:19)
nammabellari
nammabellari   13 blog posts
Re# 5783267-2               Past Edits
So what are the possibility of trains can be diverted.via Guntakal.?
I am guessing some of the trains in future

1)Howrah to sspn since it's day train running in
Between.
2)ypr
...
more...
to ns special
3)kongu
4) chengalpattu to kcg since after of mail no train in between 2 pm to 3am for chennai
5)okha to rameshwaram as this will be first train connecting to rmm from gtl
6)wainganga ,jabalpur,Lucknow via Krishna ,devrakadra high chances since it will utilise full double from mahoo nagar to ypr after electrification.
7) extension of trains from dhone to Guntakal as this may not any more loco reversal and immediately return back to guntur.
8)Tungabadra extension immediately.returm with out loco reversal. Will enter from drm route and connect to bypass line return.
9)Last but not least new train Most awaited Vandebharat .

Translate to English
Translate to Hindi

4 Public Posts - Thu Jul 27, 2023

7 Public Posts - Fri Jul 28, 2023

2 Public Posts - Sat Jul 29, 2023
Site-Related
39622 views
1

Jul 27 2023 (14:49)   MKR/Maddikera (3 PFs)
MADHUPUROHIT
MADHUPUROHIT   1004 blog posts
Entry# 5784623            Tags  
Respected sir kindly update Guntakal new bypass line to mallappa gate in Guntakal to guntur railway line in map
గౌరవనీయులైన సార్ దయచేసి గుంతకల్ బైపాస్ లైన్ నుండి గుంతకల్ లోని మల్లప్ప గేట్ నుండి గుంటూరు రైల్వే లైన్ వరకు మ్యాప్‌లో అప్‌డేట్ చేయండి
Translate to English
Translate to Hindi

12853 views
1

Jul 27 2023 (21:12)
nammabellari
nammabellari   13 blog posts
Re# 5784623-1               Past Edits
1 compliments
Agree
So what are the possibility of trains can be diverted.via Guntakal.?
I am guessing some of the trains in future

1)Howrah to sspn since it's day train running in
Between.
2)ypr
...
more...
to ns special
3)kongu
4) chengalpattu to kcg since after of mail no train in between 2 pm to 3am for chennai
5)okha to rameshwaram as this will be first train connecting to rmm from gtl
6)wainganga ,jabalpur,Lucknow via Krishna ,devrakadra high chances since it will utilise full double from mahoo nagar to ypr after electrification.
7) extension of trains from dhone to Guntakal as this may not any more loco reversal and immediately return back to guntur.
8)Tungabadra extension immediately.returm with out loco reversal. Will enter from drm route and connect to bypass line return.
9)Not but not least new train Most awaited Vandebharat .

Translate to English
Translate to Hindi

2 Public Posts - Thu Jul 27, 2023
Page#    10 Blog Entries  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

2094741 ★★★ 140~
5257556 ★★★ 135jishnuthakur12301^...
4317553 ★★★ 269AvishekRay~
1867072 ★★★ 137AmravatiSuperfast~
5403869 ★★★ 30guest

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy