Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Mon Sep 30 16:34:26 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

12004/New Delhi - Lucknow Jn. Swarn Shatabdi Express
नई दिल्ली - लखनऊ जं स्वर्ण शताब्दी एक्सप्रेस

GZB/Ghaziabad Junction --> PHD/Phaphund

Latest News
(You need to double-check/verify this info yourself)
JCO 11.06.14 to 14.06.14 will terminate @ Lucknow NR (LKO)
Sat Jun 08, 2024 (11:24PM)
News History
• JCO 30.12.2023 is Fully Cancelled.
Fri Dec 29, 2023 (01:46PM)
लखनऊ से नई दिल्ली वाया कानपुर सेंट्रल चलने वाली स्वर्ण शताब्दी एक्सप्रेस (12003-12004) का छह सितंबर से औरैया जिले के फफूंद रेलवे स्टेशन पर ठहराव रहेगा। फफूंद स्टेशन पर एक-एक मिनट का स्टॉपेज दिया गया है।लखनऊ से चलने वाली 12003 स्वर्णशताब्दी शाम 5:47 बजे और दिल्ली से आने वाली ट्रेन संख्या...
more...
12004 सुबह 10:14 बजे आकर एक मिनट के लिए फफूंद में रुकेगी।
Wed Aug 30, 2023 (10:43AM)
🔹12004 NEW DELHI-LUCKNOW SHATABDI EXP Journey Commencing from 28/08/2022 to 02/09/2022 has been diverted via UNNAO-BALAMAU-ALAMNAGAR-LUCKNOW
Tue Aug 30, 2022 (05:40PM)
Train 12004/New Delhi - Lucknow Jn Swarn Shatabdi Express commencing journey till 31 March 2020 will remain cancelled.
Fri Mar 20, 2020 (10:22PM)
2 Follows
Bedroll/Linen: NOT Available
Inaugural Run
Fri Mar 24, 1989
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
➡️ Breakfast is given just after ALJN. Breakfast includes Mango juice,Bread...
more...
butter,Tea and Veg Cutlet.; ➡️ E- Catering as available at TDL, CNB & LJN.
Updated: May 07 (13:02) by ArmyRF^~
Dep:
Arr:
RSA - Rake Sharing
No RSA.ISO Certified Train. PM at NDLS/NR
Rating: 4.3/5 (211 votes)
cleanliness - excellent (36)
punctuality - good (37)
food - good (36)
ticket avbl - good (37)
railfanning - excellent (32)
safety - excellent (33)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 K1
  3
 E1
  4
 C1
  5
 C2
  6
 C3
  7
 C4
  8
 C5
  9
 C6
 10
 C7
 11
 C8
 12
 C9
 13
C10
 14
C11
 15
C12
 16
C13
 17
C14
 18
C15
 19
C16
 20
EOG
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    1183 blog entries  <<prev  next>>
Info Update
1294905 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   570 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced wnd cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that my post don't get archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can see that whether this coach composition for train sets will become a successful idea or will become a flop idea.

Translate to English
Translate to Hindi

More Posts
General Travel
77091 views
7

Jun 29 2023 (16:24)   12004/New Delhi - Lucknow Jn. Swarn Shatabdi Express | LJN/Lucknow Junction NER (6 PFs)
Dgvj01~
Dgvj01~   2798 blog posts
Entry# 5764791            Tags  
Why trains on CNB-LKO section runs with such a lower average speed ? is IR taking any measures to increase the speed of train or reduce the TT on this section ? fastest train covers LKO=CNB with an average speed of around 50-55 kms. TT should not be more than 45 mins on this section for a non stop train
Translate to English
Translate to Hindi

25 Posts

31780 views
3

Aug 22 2023 (01:27)
PrakharYadav^~
PrakharYadav^~   15881 blog posts
Re# 5764791-26               Past Edits
1 compliments
Great
Operational PURVANCHAL EXPRESSWAY (341km | Lucknow - Azamgarh -Ghazipur ) would be linked to under construction GANGA EXPRESSWAY (594km | Meerut - Unnao - Prayagraj) via KISAAN PATH / LUCKNOW OUTER RING ROAD (NH 230) and LUCKNOW KANPUR EXPRESSWAY (NE 6) through cloverleaf & trumpet interchanges. (Refer attached map)
Hopefully, once Ganga e-way is operational, we might see a link road between the aforementioned e-way(s) to simplifying the travel.

Yes,
...
more...
Lucknow ORR / KP already encircles or forms ring around Lucknow. Cloverleaf Interchange for Lucknow Kanpur Road (NH 27) with Lucknow ORR / KP is under construction providing seamless connectivity. (Refer attached map)

Indeed, as Agra Lucknow E-way and Purvanchal E-way have ends on west and east side of Lucknow respectively, one has to tear the city to connect both E-way(s) currently. I myself have been victimized in the same. But once Lucknow ORR / KP is ready, they will have access controlled connectivity.

I have traveled on Ayodhya Road couple of times and it is a decent one. I read in one of the article that NHAI has cancelled its six-laning prior to Ram Mandir's opening as it might leave negative impact on pilgrims if NH construction is in process.

Gorakhpur Link Expressway has been in controversies since it was thought of. Nobody is happy with alignment of the same. Further, the 91km GKP Link e-way would cost around ₹ 5,876 crores which is again debatable. GKP Link e-way was scheduled to open by Mar' 22 but still it shows no clear picture of its completion. even Hon'ble UP CM is not happy with its progress.

Feedbacks / Suggestions / Questions are welcome. :)

Translate to English
Translate to Hindi

24460 views
0

Aug 22 2023 (06:36)
harshityadav~
harshityadav~   1463 blog posts
Re# 5764791-27              
Yeah, 6 laning nh27 without an alternative path would have been very bad for north bihar & entire north east connectivity from north.
They may do it once GKP E way is complete, which isn't very far.
The biggest structure in 91km eway : the saryu bridge has been Completely launched.
Translate to English
Translate to Hindi

22119 views
0

Aug 22 2023 (14:54)
PrakharYadav^~
PrakharYadav^~   15881 blog posts
Re# 5764791-28              
six-laning doesnt hamper much of existing NH movement. e.g. NH 19
Translate to English
Translate to Hindi

2 Posts

22026 views
2

Aug 22 2023 (16:50)
PrakharYadav^~
PrakharYadav^~   15881 blog posts
Re# 5764791-31               Past Edits
1 compliments
Useful
National Expressway 6 i.e. Lucknow Kanpur Expressway has honestly disappointed a lot.
At first, it got too much delayed which raised the construction cost.

The entire section in Lucknow district is BROWNFIELD, both elevated and at grade to NH 27. The section in Unnao district is GREENFIELD.
...
more...

The smallest expressway of India i.e. NE 6 is hardly 63km in length begins near Amar Shaheed Path in Lucknow and ending in Unnao District. WHY IS IT EVEN CALLED AS LUCKNOW KANPUR EXPRESSWAY THEN ?

The pioneering road leader - UPEIDA has missed a lucrative opportunity to connect the cities of Lucknow and Kanpur which would have earned a handful share of revenue.

Translate to English
Translate to Hindi

2 Posts

19224 views
0

Sep 08 2023 (14:33)
PrakharYadav^~
PrakharYadav^~   15881 blog posts
Re# 5764791-34              
but why was CPR LTT JS diverted via PRYJ ? when it got diverted ? also, it was to/from CSMT naa ?

haan, NR - NER mei coordination mei kaami hai.
but if NR is not allowing block, tab tak NER apne aur kaam ko tab tak nipta le except underpass below LKO BE line.
I
...
more...
dont think it will take place anywhere during rainfall. so expect more delays.

Translate to English
Translate to Hindi

More Posts
General Travel
20718 views
4

Jun 26 (10:02)   12003/Lucknow Jn - New Delhi Swarn Shatabdi Express | LJN/Lucknow Junction NER (6 PFs)
BangaloreMail^~
BangaloreMail^~   26814 blog posts
Entry# 6106144            Tags  
Can someone tell me if the loco coming with 12004 goes back with 12003 or a fresh loco is given at LJN?
Translate to English
Translate to Hindi

1 Posts

13860 views
2

Jun 26 (10:10)
WAP5CLW
WAP5CLW   101 blog posts
Re# 6106144-2              
1 compliments
Useful
Same link goes back. Power/Link is being maintained by NDLS Trip Shed.
Translate to English
Translate to Hindi
Rail Fanning
22506 views
0

Jun 26 (20:05)   12004/New Delhi - Lucknow Jn. Swarn Shatabdi Express | JTU/Jaitipur (2 PFs)
mumbailucknowacexpress~
mumbailucknowacexpress~   492 blog posts
Entry# 6106578            Tags   Past Edits
Lucknow Shatabdi Express Crossing Kusumbhi Station | IRFCA 2024
Translate to English
Translate to Hindi
General Travel
18469 views
2

Apr 23 (19:56)   12003/Lucknow Jn - New Delhi Swarn Shatabdi Express
Priyanshu_BBS~
Priyanshu_BBS~   135 blog posts
Entry# 6041264            Tags  
LJN - NDLS Swarna Shatabdi
Translate to English
Translate to Hindi
Page#    1183 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy